Testimonials

Performance certificates and appreciation letters from the industries that run Cooltech cooling towers – from captive power plants and fertilizer units to steel rolling mills.

Trusted byRCFBHELWelspunLloyds MetalsHindustan FluorocarbonsBangladesh FertilizersAllied FerromeltSri Rama DistilleriesSahney KirkwoodGanpati AlloysBholaram Metal+ 3,100+ other clients
Testimonial letter from Bholaram Metal Industries Pvt. Ltd. to Cooltech EngineersView letter
Steel rolling mill · 2018

Bholaram Metal Industries Pvt. Ltd.

Crossflow wooden cooling tower, Model 68-1, Class 10

“In regular operation for the last 6 years. We are satisfied with the performance of the cooling tower.”
Testimonial letter from Ganpati Alloys, Silvassa to Cooltech EngineersView letter
Metals · 2014

Ganpati Alloys, Silvassa

2 cooling towers – 110 & 60 m³/hr

“Both cooling towers are working since 2012 and we are satisfied with the quality and performance.”
Testimonial letter from Bangladesh Fertilizers & Agrochemicals Ltd. to Cooltech EngineersView letter
Fertilizers · Export · 2006

Bangladesh Fertilizers & Agrochemicals Ltd.

Cooling tower erection, Bangladesh

“Erection of the cooling tower supplied by Cooltech was completed to the satisfaction of our company.”
Testimonial letter from Lloyds Metals & Engineers Ltd. to Cooltech EngineersView letter
Steel & engineering · 2005

Lloyds Metals & Engineers Ltd.

Cooling tower work

“Completed cooling tower work satisfactorily. Found OK and running properly.”
Testimonial letter from Hindustan Fluorocarbons Ltd. to Cooltech EngineersView letter
Chemicals (Govt. of India enterprise) · 2003

Hindustan Fluorocarbons Ltd.

Cooling tower rectification – two sections

“Rectification of the cooling tower (two sections) completed as per the work order.”
Testimonial letter from Sahney Kirkwood Ltd. to Cooltech EngineersView letter
Dielectric moulding · 2001

Sahney Kirkwood Ltd.

2 FRP cooling towers

“Results are well within limits and both cooling towers are working satisfactorily; moulding cooling cycle time reduced by 20 minutes.”
Testimonial letter from Sri Rama Distilleries Ltd., A.P. to Cooltech EngineersView letter
Distillery · 2000

Sri Rama Distilleries Ltd., A.P.

Cooling tower erection & start-up

“We have seen the performance and found the working satisfactory – inlet water 32 °C, outlet 23–24 °C.”
Testimonial letter from Bharat Heavy Electricals Ltd. (BHEL) to Cooltech EngineersView letter
Corporate R&D, Hyderabad · 1995

Bharat Heavy Electricals Ltd. (BHEL)

Cooling tower commissioning

“All three fans were running and the performance of the tower in cold condition is satisfactory.”
Testimonial letter from Rashtriya Chemicals & Fertilizers Ltd. to Cooltech EngineersView letter
Fertilizers · Captive power plant · 1982

Rashtriya Chemicals & Fertilizers Ltd.

4,150 m³/hr cooling tower, turnkey

“Performance guarantee test conducted satisfactorily as per CTI code; the cooling tower has been in commercial use since November 1979.”
Testimonial letter from Allied Ferromelt Pvt. Ltd., Pune to Cooltech EngineersView letter
Rolling mill – TMT bars

Allied Ferromelt Pvt. Ltd., Pune

Induced draft cooling tower, Model IT-672

“We are satisfied with the company and performance of the cooling tower.”
Testimonial letter from Welspun Power & Steel Ltd. to Cooltech EngineersView letter
Power & steel

Welspun Power & Steel Ltd.

Cooling tower supply & erection

“The cooling tower supplied has been put in place and duly assembled.”

Join 3,100+ clients worldwide

Tell us your flow rate and temperatures – our engineers will recommend the right cooling tower.